This was previously an  8 foot wall seperating a tub surround that we turned into a Pony Wall and Shower.  The tile is 13 x 13 porcelain with a 2 x 2 feature stripe with  two corner shelves and grab bars.

We had to replace the entire subfloor and rebuild the bathroom from the floor up including all the plumbing.  All said the project took 3 weeks to completion.